TIMELINE

Time is Always a Factor Here’s What to Expect

Abstract smiling face made of geometric shapes in black and yellow.
Man wearing a baseball cap, glasses, and a t-shirt with 'Innovative Construction' logo, standing at a construction site with wooden framing in the background.

Step One:
Design Phase

1-3 Months

We start by getting to know you—your lifestyle, your needs, your vision. From site visits to vision boards, this is where your dream home begins to take shape.

Includes:

  • Client onboarding + project window access

  • Site visit & infrastructure review

  • Wish list, tear sheet, and vision board review

  • Conceptual design & preliminary budget

A stylized yellow zigzag lightning bolt with a small yellow triangle beneath it, on a black background.
A person measuring a stack of plywood sheets outdoors at a construction site.

Step Two:
Pre-Construction

1-3 Months

This is the selection stage—materials, systems, layouts—where big design choices meet real-world planning. We guide you through each decision with clarity and care.

Includes:

  • Interior & exterior selections

  • Engineering, permits & planning

  • Cabinetry, plumbing, HVAC, water & septic

  • Electrical layouts, schedule & final budget

A black stick figure holding a yellow brush or tool, with a yellow shape next to it, on a white background.
Two construction workers working on a roof, one using a level and the other with a power tool, against a clear blue sky and green trees.

Step Three:
Construction

Timing Varies by Project

Time to build. With everything prepped, we move efficiently—keeping you looped in through our online Client Project Window.

Includes:

  • Site prep, foundation, framing & roofing

  • Window install & interior finishes

  • Trade coordination & inspections

  • Schedule + financial tracking

A gold plus sign, a black check mark with a slash through it, all on a black background.
A modern house with a large A-frame roof and extensive glass windows, featuring a stone staircase leading up to a patio with outdoor furniture and flowering plants.

Step Four:
Move-In Prep

Almost Done!

Before you get the keys, we ensure everything’s spotless, inspected, and running smoothly. Plus, we walk you through how your home works—no surprises.

Includes:

  • Full cleaning & pre-delivery inspection

  • Final municipal approvals

  • System walkthroughs & homeowner binder

Timelines are approximate and can overlap depending on the project.